Board of Appeals (ZBA) — 2026-11-18
Agenda
Transcript
▶ 0:06 Good evening, and welcome to the regular meeting of the Melrose Zoning Board of Appeals. Today is Wednesday, November 18th. Pursuant to Chapter 2 of the Acts of 2025, this meeting of the Melrose Zoning Board of Appeals will be conducted via remote participation. A video recording or other record of the proceedings will be posted in the city's website as soon as possible. I want to introduce the participants from our side. Board members Dan Gelmini, David Roach, Chris Coughlin, Liz Ryan, Jeff Eugino. I'm Brian Thorpe, the chair, and joined with our clerk from the planning board, Adam Forster. We will follow the usual procedure for our meeting tonight. First, I will call the petitioner applicant of the appeal to present
▶ 1:10 their appeal to the board. Then I will open the meeting to public to provide any comments related to the application. The petitioner will then have an opportunity for any rebuttal. We will close the public meeting, and I expect the board will deliberate right away. They'll likely have decisions tonight. Prior to the beginning of public comments, I just want to remind everyone that all speakers are encouraged to present their remarks during public comments in a respectful manner whenever possible. Please try to refrain from mentioning the names of private individuals in your public comment remarks. The comments and views expressed by speakers during the public comment time are theirs alone and not in any way a statement of the
▶ 1:59 city or its representatives. When we get to the public comment section, if any member of the public would like to speak regarding one of the matters scheduled tonight, when it's time for public comment, please use one of the following methods to present your comments. You can use the raise your hand feature on Zoom, and our clerk will elevate you to speaking position, or you can send an email to appeals@cityofmelrose.org. Adam will also be checking that to make sure that we have given you a chance to speak if you would like to. So we have a few cases here tonight. The first case is case 2601835 Linwood Avenue. This was a request to continue from the last meeting. This is the appeal of David M.
▶ 2:55 Griffin for variance from Section 235-6.2 of the zoning ordinance for minimum lot area and lot frontage, and Section 235-11.5.C2 for two driveways within less than 30 feet of each other, all to construct an addition onto the existing single family to convert the structure to a two-family dwelling at 35 Linwood Avenue, a lot of land consisting of 7,963 square feet, shown on assessor's map D5096. I see the applicant here. Okay. Waiting for him to join. Great. So David Griffin, or anyone else, if you have anyone else on your project team, are you ready to present? Okay. Attorney Bell is listed as a representative on this project as well. Thank you. Okay, he's joining. Good evening. We can hear you.
▶ 4:50 Okay. I think I got the camera on here. Good evening. Hi. Good. We can hear you. Why don't you tell us why you're here? All right. So Bob Bell, I had Bob Bell retained as an attorney, and sorry to say, he fell short of some expectations at the last meeting. Didn't send all the paperwork in properly for the board to review, and struggled with the computer as well, and it was a little bit of a frustrating task working with him, so I had to let him go. So I did have my builder speak with someone at the town, and from the last meeting, it appeared that you felt that the structure that I was looking to add was too big. I've since resubmitted a new proposal. Prior, it was 28 feet by 40 feet, and we
▶ 5:45 reduced it down to 24 feet for the frontage. Like, my existing main part of my house is 22 feet, so I don't know if you have those new diagrams. Those drawings- Those were sent in ... they were sent on the 11th, and so we do see the plans, but thank you for that. And as far as the driveway variance, I know it's saying that the prior driveways, I don't know how it ended up saying that they were less than 30 feet, because they were 36 feet as double driveways, and then some of the response I got back was if I could do tandem driveways, and I had the engineer retake care of that whole thing, and I resubmitted that yesterday as well. That came over late yesterday, I sent that to Adam. So now it should reflect tandem driveways, so they're not within 30 feet
▶ 6:42 any longer, so that variance shouldn't be required. I think we received that drawing today. The board members received it today. Yeah. And on it, it's still showing the wider curb cut. So is it your intention to reduce the driveway width? Okay. Yeah, so on the left side of the house, that curb cut is already existing. It goes across my two-car garage, and then it also incorporates my driveway, so that is an existing curb cut. The note that I did receive from the engineer was, this curb cut on the right side for the tandem driveway, it wouldn't need to be that large, and her response was they would need to know how big that curb cut would need to be to accommodate the tandem driveway instead of the double driveway.
▶ 7:42 We don't regulate the curb cuts. Okay. The city, yeah, you'll have to talk to- Public works will deal with that. Public works. Yeah. I got the drawing, and the only thing was it wasn't exactly clear to me what the actual driveway was. Like, I see the two sets of rectangles, like the tandem rectangles. Is that all that's being paved? Yes. Okay. Because it's like, they're like actual rectangles, like a gap between them. Is it going to be like... You know what I mean? Like, they're just drawn kind of weird? Yeah, I think she was doing it just to let it know that it was two spots and to separate it into two spots. But everything else is going to be grass. Like right now, the backyard behind the garage, that's all pavement.
▶ 8:31 I wish she had just drawn like the limit of the pavement and not the rectangle so we could be clear, like, is it a 10-foot-wide driveway? I hope it's a little wider than eight and a half feet. Like eight and a half feet's the parking space, but you know what I mean? Like, you're not actually going to do four little rectangles of pavement. You're going to do it- No. No, it's going to be one. I guess I would have to ask, the need, what would the benefit be to have- ... a tandem driveway where if you have two cars in there and the first car in has to leave, then the car behind it's going to have to pull out onto the street. And honestly, this street, I've been here since '73, this street now is
▶ 9:14 excessively busy and especially with the new construction across the street. It's a gong show. What's that? It's a bit of a bleak show- Yeah ... especially because of the cross street. Well, like I said, we reconfigured it to have the tandem driveways, if that's what's required or necessary. But, I guess I just was just curious on- Well, I think the tandem parking, the understanding was that the driveways would be narrower and ameliorate the space between the two driveways that are proposed. So, I think that was the intent behind proposing tandem parking and narrowing those curb cuts. But in fact, I think David's point is probably a little more salient here, is that it would be really helpful for us
▶ 10:13 to understand what the true paved area is. There's a gap between the two boxes. So, if we look at these drawings, I think we would say the driveway could be 36 feet, in terms of depth, but I'm not sure that's what was intended, because there's a space between the box. But there's no overall dimension defining any of the pavement. Well, I guess to pause for a second before, I'm hearing like, "We'll do this, but I don't want it," kind of thing. Yeah. No, no, it's- Or like, "I don't understand what the upshot of this is." Yeah, I guess that's it. Like I said, I had the 30 feet. I know the variance says I'm looking for a variance for the less than 30 feet, but the prior proposal, it was 36.8 feet, and we never got to that for various reasons
▶ 11:15 on the last time around. So, there was no- There's no dimension on the drawing, Mr. Griffin, so there's no way for us to understand that or have any kind of document that says that's exactly what's going on. If I could for a second here, right, because I think I see- Yeah. I understand, because my question when I looked at this was going to be just that. If I look at the two 25 car cuts, the space between is obviously greater than 30 feet, because it's more than one and a half times the width of those 25 car cuts, right? When I eyeball that, I mean, it's close. Yeah. Not 40, it's more than 30. No. So, I think what you're saying, David, is that if you did 20-foot driveways, 20-foot wide driveways, you'd be more than 30 feet between them, right?
▶ 12:13 Because the driveway's 20 foot wide? Correct. But like I said, one of the curb cuts, one is proposed, the one on the right side. The one on the left side, it's already done. I don't think there would be any need to put the curb or the sidewalk back in. So, wait. So, just to pause for a second. So, it's already done. I can see underneath it where that letter B is, is the old D stone. That's already moved? No, no. It's the one where it says, "Existing curb out, curb cut to remain." So, that curb cut on the left side there, where it says, "20-foot curb cut to be verified and proposed curb cut to be installed," my driveway is already open now. Like I said, I have a two-car garage. What we used to do-
▶ 13:09 It's between the... Right. So, David, the existing curbs are from the far left to that B spot. Right. That was a big wide driveway before. That's correct. So, that's the challenge here, is that it's not clear that you're narrowing the driveway on that side up less than... It's less than 30 feet between the driveways if you keep the driveway the width of where that B, D stone is. It's just not clear what you're doing. I don't know. It looks to me like... How many parking spaces do you need? Four. It looks to me like you could do two side-by-side parking spaces, 20 by 20, whatever, two rectangles there, and have more than 30 feet between them and be done. I had that from the last time, and the response
▶ 14:09 was- Can I say something for a second? And you- Yes, Adam. So, I think because there were a few different versions of these plans, it was a little confusing. And we had a note in the staff brief about the previous design that wasn't tandem parking, that was the parking spaces right next to each other, and how they were proposed to be pervious, but the maintenance of them and how to confirm that they were pervious was kind of unclear. So, this was a suggestion due to the open space requirement in the front yard, in the building front yard as well. So, I don't know if you have that information to make it more clear. So, Adam, you were saying that- I think there was a little confusion between when the plans were submitted too.
▶ 15:13 Got you. Which we already talked about, but- Yes. I mean, to cut to the chase here, there's no benefit to stacking these cars end to end versus putting them side by side, if they're compliant in either scenario, or they're not compliant in either scenario. I don't understand. That's what the confusion was kind of over the initial legal notice about being more than 30 feet apart. Mm-hmm. That was also unclear on the previous plot plan, and then we got this updated one today. Yeah. So, also the proposed curb cut, that was unclear if it was lining up with the parking spaces or not as well, what they were requesting, so... So, it seems to me like if he were to draw plans that had two side-by-side spaces on either side of more than 30 feet, and if you just
▶ 16:23 took on this drawing, if they just drew that square, essentially, that would have the two cars on each side, and dimension those, and clearly call it out as the driveway, and then dimension the spaces between as something greater than 30 feet, is it compliant then, Adam, in that scenario? That is what I submitted, exactly what you're saying, and it shows 36. So, David- I'm sorry. Okay. David, from the last meeting, I think one of the things to keep in mind is that the project is still covering too much. It exceeds the building requirement. To separate out the driveway- I'm just trying to see if we can get rid of this driveway configuration issue, which is what we're saying. What I'm trying to get to, Brian, here is like, is there a way-
▶ 17:24 He would not. He could potentially withdraw the parking, that variance item, if in fact the two driveway curb cuts are greater than 30 feet between each other. That's what I'm trying to get to. That's a correct statement, David. I think the larger statement, the larger piece of this was the staff believing that parking in tandem would increase the green space in front of the building. And then the second piece of this is that because there is, they were asking for additional information about the pervious pavers to address the coverage, not the- Not the curb cut issue, but yes. There is- I'm trying to find a path where this doesn't drag out another month because of this confusion that seems to be created by multiple parties here.
▶ 18:22 I think there's still some discussion to be had about- On that issue, assuming we can get through the rest of it. Yes. Okay. I don't want to take like... All right. Thanks. Yep. Well, at minimum, David, we would require them to be back here because I'm going to have to have a drawing that is- Got to get a drawing that matches what he's going to do. That matches what is going to be done. Regardless of whether the cars are tandem or side by side, I need extra dimensions. We got- Well, can I come up one second? Mr. Griffin, do you have the old plan? I submitted the new plan with the 24 foot, with the house dimensions and the elevation. I submitted that along with the new plot plan with the driveway side by side with
▶ 19:17 the 24 foot, and then- We have it. It's just not on the site now because it was superseded. Correct. You want me to pull up the whole plan? I think it could be worthwhile because if we can churn through the rest of this and that plan has sufficient information on it, I'm just trying to see, like, is there an exhibit that could reference what he wants to do? Because otherwise, we're going to be at this for another month. Yeah. That one is clear. I'm looking at the prior one that was submitted after the last meeting. No, it's not that one. Mm-mm. Same one. Can I ask a question while we're pulling this up? Yes, Chris. Mr. Griffin, it looks like on the left side of your property, your neighbor currently is using what seems to be your
▶ 20:13 property as part of their backyard. Is that true? I'm sorry, what was that? So on the left side of the driveway as it exists now, that curb cut actually lines up with the edge of your existing garage, but also the fence line that separates you from the neighbor's house. Well, there's a telephone pole there, so if you went straight back from the telephone pole, that would be my property, and the curb cut is in a little bit. The curb cut lines up with the garage, and then to the left of the garage, I think it's like five and a half feet of my property. That's being used by your neighbor, right? Not in my use. At some point, it was fenced in, yes. Is the plan to remove that fence at all? Yes. The garage would have to come down, and then that fence would come down, and
▶ 21:16 then... And that retaining wall will stay the same? The retaining wall will stay the same. That retaining wall, if you go straight back, it lines up with another wall that's in the back of my driveway. Okay. And it goes straight back. So behind the garage, there isn't a wall, and then once the garage ends, there's another wall. So that wall, I would just have to continue that wall from the one you're asking about to the other wall at the back of the property, and then the neighbors... I've already talked to the neighbors. She's going to have to move that fence. All right. Yeah, what I'm trying to confirm is when you look at the house, like I'm looking at Street View right now, it looks like your property ends at the garage,
▶ 22:00 but that's not true. You have another five and a half feet, right? That's correct. Okay. So, Brian, this plan is much clearer. It is clear. Well, that's why I was asking, because I feel like this would be an exhibit that soon we'll get through everything else, tells us everything we need to know. I'm adding... I don't know if you see the notation on the open space. The backyard will be all grass. Right now, it's all pavement. In front of the garage, there'll be the two spots, and then to the right of that, where there's a driveway, that will be all grass now. So I'm adding all kinds of grass. The stormwater report came back that there was no... They didn't see any issue with stormwater adding, reducing the
▶ 22:51 pervious materials. And this is the one, yeah, this is the one, right? This is the one I had sent, that got sent back asking to go to tandem. But this shows the 24-foot reduction from 20 feet. You get the two driveways side by side, it gives a distance. This one is a little bit more clear. The front will be all grass. I already have grass. I have a front lawn as it is. But towards the front of the new addition, I would add more grass. It would be another lawn. It would be a front lawn. Is the intent to provide pervious pavement for all four spots? This drawing only shows the notes for two. Yes. So you would provide it for all four spots. And what is that going to be? Do you know? Pervious pavement.
▶ 23:57 The pervious pavement? Correct. What is it going to be? Pervious pavement. Yeah. What product is it going to be? What are you proposing that that be? Pervious pavement, there are lots of different ways to create a pervious pavement system. Some require maintenance, some don't. I'm just curious what's your intention? It's fine to put a note on it, on the drawing, but there needs to be some understanding of what it is. I would think at this point, yeah, I've got it. My brother-in-law is a paver. He would just pave it. Well, that's not pervious paving. If he's a paver and he paves it, it's not pervious paving. So, it has to be an engineered material. It has to allow water to go through it. The way to really make sure that it actually is that it would be to do pervious
▶ 24:59 pavers, or you have to do porous asphalt, which is a specialty product. And you don't want to do that. Which requires significant base preparation, and it doesn't work all that great, to be honest with you, in this kind of application, so... I was trying to lead you to some spot there, Mr. Griffin, just without coming right out and saying that, but yeah. No, I understand. Like I said, up to this point here, I've tried to work out the size of the house and all these other configurations. As far as that point, I could get a much better answer than I don't know, which I hate to have for a response. But right now, I did not get that far as far as this plan here. I was looking for the variance. Understood. That's okay.
▶ 25:44 If you need a distinct- I'd suggest that pervious pavers, and this isn't a huge area, is the way to make sure you're covered in terms of it's done correctly and everyone's comfortable that you're doing what you say you're going to do. That's what he did across the street for his entire lot. It looks nice. I mean, it does. So, Mr. Griffin, that's why that was in the staff brief as well. Just knowing what the maintenance and the plan is for these pervious pavers, or whatever the pervious pavement that you're planning. We'll just make sure that that gets- And- Yeah. I think that's what the tandem idea was around as well. Because there's open space requirements in the building front yard. So, just more details on that would be helpful.
▶ 26:42 Yeah. Okay. Is there anything you'd like to add before we ask you a few more questions? So, are we leaning more towards this side-by-side driveway plan? So I know which one we're... Not the tandem. That one that's a little bit more clear on what's going on in front. Is that where we're at? I think that from a dimensional point of view, if in fact the two driveways where they're next to each other, or the cars are stacked side by side, if in fact that is dimensioned and presented as more than 30 feet, you won't require that. That variance will not be required, and you can withdraw that request. Issue remaining before the board then is the amount of lot coverage. There's a lot size issue, and the percentage of
▶ 27:48 coverage, which is why we're discussing the pervious pavement, because that obviously, you're putting a building in, you're taking a garage down. There's some pluses and minuses, but the site requires more open area as a percentage of the lot. Does that all make sense to you at this point now? Yes, it does. Okay. So, let's go to the next topic, which was narrowing the house. I do have the latest plan showing that that's a 24-foot dimension of the addition. Is that correct? That's correct. Initially, it was 28, and we reduced it to 24. So, I do have one question about the elevations. If you can pull up A4.01. And Adam, can you share that, or can we get it up on screen? Okay. Go to the elevation.
▶ 29:20 Yeah, that one. I'm trying to understand what's happening at where the two gables are, how that's overlapping. I guess I'm just trying to figure out how that inside corner condition works. There's a slight recess there. Is that correct? For the existing house? I'm looking right at the intersection of the gables as they come down between the old house and the proposed addition. Yeah. Is the addition proud of the old house, like sticks out past it? Is that what we're asking? It does. The addition would, yes. It does, but I still have some question about how that- How that detail works? I don't understand. I see it in the plan, but I don't understand it in terms of how it works in three dimensions.
▶ 30:26 And I'm trying to understand what the cross gable piece does. That was more of a just... I mean, if we had just two peaks and we just felt it would just look, the look of it would just look good. We actually threw that drawing around a little bit. I didn't present it, but back and forth with the builder and myself. So, instead of just having the two peaks of the house, we were going to have this little section right here just kind of go across to kind of get the two combined and make it look a little bit more better from the sidewalk. I mean, like I said, we tried- What if we had it on both, Brian? Would you be asking that question? What was that? Would you be asking that question if it was added to the existing instead of-
▶ 31:13 Probably not. I'm just trying to understand what that space is really there for. Anyway, it doesn't do anything for me. It makes the house bigger and less appropriate from a scale perspective on the street. But, anyway, I guess we can talk a little bit about that later, but I just wanted to understand what I was looking at in the plan here and in the elevation. Board members, do you have any questions for the applicant at this time before I open the hearing for public comments? Okay, hearing none, we're going to open the hearing to public comments. Adam, is there anybody who would like to speak in favor or in opposition to this proposal? I don't see anyone. Okay. At the last meeting, I submitted some letters. I feel like I got total support from the neighborhood.
▶ 32:35 I went around, spoke to a lot of people. They said they were going to call. I know I submitted some letters, and there was a couple of calls, but I don't know. I didn't see a call just now. Hang on. We can get to that. I'm going to check the email to see if we have any. We're checking right now to see if there's somebody tonight who would like to speak. We do have that information as part of the record. So, those people that voiced support or opposition in that first meeting, that's all been accounted for within this. Yeah, I haven't received any new comments since the packet I sent for the first hearing. And Adam, can you pull up old- Yep ... old ones just to get a brief flavor to remind the
▶ 33:29 board? Yeah, there's a few comments in support and some opposed. You want to give us those addresses? Sure. So, 4 Park Street in Melrose, they are in support of this project. Nikolai Radzinski. This letter is from a property owner of several properties on Linwood Ave. They approve of this request. June Sheridan. This letter is from Sharon Porcaro. Porcaro, yeah. Porcaro, 41 to 43 Linwood. They want clarification about the stormwater management in this project. They're a direct abutter. They're concerned with changes to the grading, drainage patterns, and an increase in impervious surface area. So, they ask the board to find out more information about stormwater issues that this project might cause.
▶ 35:34 Yep. John and Joan Finley at 63 Linwood Ave, they support the project. And that's it. Okay. Let's see the... So, Mr. Griffin, when you say you're taking the garage down, you're taking the fence down that's adjacent to the garage, and you're taking down that portion of the wall that's adjacent to the garage. Is that correct? No. As far as that wall goes, what we're going to do with that wall, it turns the corner into the garage, and then behind the garage is another existing wall. When the garage comes down, I would just run that wall and meet up with the wall in the backyard. I don't think the driveways are affected by that wall, whether it's tandem or side by side, so there's really no need to take down that wall. That wall would just continue up and meet up with
▶ 37:00 the wall in the backyard. Okay. Like Porcaro's property, it's even the property in the backyard on Park Street, I'm down, they're about- Yeah ... they're about four feet up. And so Porcaro is, so is whoever owns that house- The house next to it ... on Park Street. Yeah. But so, they built that wall in my driveway that's been there since forever. That wall on the bottom has been there. It doesn't make sense to knock down that wall and have to deal with- No ... any sort of issues. Just continue that wall up, which would eliminate any sort of degrading if that was a concern. So, I'm going to cut to the chase, and I'm going to apologize for suggesting this, but one of the things that the board wants to do and is pretty
▶ 38:01 clear about is having documents that align with what's actually going to be built so we can follow up if there's ever any issue with it. So there are a couple things I see here. We do have the site plan basically finished with the parking spots. I would like to have a dimension on the drawing that confirms the space between the two curb cuts. I think if you put that on there, then you can request to have that variance, you can withdraw that request for the driveway variance. Okay? That's the first thing. The second thing I would like to have you do is show on the new plans or the plot plan the extent of the new wall that you're proposing to construct along that side of the property. That will assure that the Butters don't have any potential
▶ 39:16 issues, and that you don't have any potential issues with their site draining into your property. If you can have that for us prior to the December meeting, I think we can get this done pretty quickly on that date. All right. And you also want me to specify the type of materials for the driveway, so I- Yes ... take care of that while I'm at it. Yes. All right. All right, so just back to the curb cut. So it's not so much the distance between the driveways. You're saying it's the distance between the curb cuts, not between the driveways on the property. Correct. Okay. That's correct. All right, I understand. That's not correct, David? We don't regulate curb cuts. We don't. We regulate driveways. It's the distance between the driveways at your property
▶ 40:22 line that matters. Thank you. Curb cuts will be set by the city. Thank you for correcting me, David. Yeah, the variance is for the driveways. Yes. Sorry. It's confusing, all of it. That's why I have you here. Yeah, so are you clear, Mr. Griffin, about what you need to provide to us so that we can take care of this for you? Right. Just back to the driveways again. It shows 36.83. What's on your drawings is sufficient, Brian. The only thing I think that we need to be clear on is the material. Okay. All right. Extent of the material. Yep. Okay. Oh, yeah. I'm looking at the old drawing. I'm looking at the new drawing, David. Yes. The one that I had them dig up is fine. Board members, do you have any comments about the overall
▶ 41:28 site? Any questions about the coverage? I don't know if there's been an analysis done, removing the garage and the amount of paving, whether it's a- My eyeballs tell me by looking at the aerial that it's a net reduction, but that's maybe just my eyes. Yeah, I can't- So, Brian? Yeah. The other variance is for lot area and lot frontage because they're going from a single to a two-family. And it's 10... They're at 89 feet width, and it's 100 required. Is that right? Yeah. 100 is required for frontage. They're at 85.91. Yeah. And then the lot area was okay for a single family, but they're going with this addition, they're converting it to a two-family, so... Right. And they have about an 8,000 square
▶ 42:27 foot lot, and they need 10,000 square feet? Yeah, 10,500. Yeah. So board members, any thoughts or comments about those issues? I want to try to get- I would note that four units were just built across the street with 110 feet of frontage, so that's enough wildlife. I don't think this is anywhere near as impactful as that will be from a frontage perspective. Any comments, folks? Questions? Okay. I'm going to take that to assume, Mr. Griffin, that the board is not troubled by the amount of coverage on the lot, considering the amount of paving you're removing, adding in lawn and pervious surfaces. I think that at least allays a lot of my concerns with the size of the addition. I guess, sorry to chime in late, but-
▶ 43:46 No ... I would feel a little bit better if we knew that there weren't going to be any issues with reclaiming that five-foot stretch on the left side of the driveway. It looks like that fence has been there for a long time, and- I don't know that that's necessarily... They're going to build that. The wall will be continued from back to front, so the area that the garage is occupied now is going to be a retaining wall that extends between the two areas. So, I'm not sure how- I would share your concern, Chris, if the garage wasn't creating the fence condition today. But when he goes to demolish that garage, the neighbor's now going to be left with an incomplete fence. And I believe the neighbor wrote a support letter.
▶ 44:44 They had a question about the drainage, but they were generally supportive of the project, I think. And that's one of the reasons I wanted to have that wall documented so that the grades would remain in kind. There wouldn't be any dip in there. He's going to continue the wall that's there now. And from a practical purpose, you're right, that little five-foot section has been part of the Porcaro's yard. But I have part of my yard that my neighbor technically owns as well. And that happens in the city of Melrose. My neighbor in my old house used to mow 20 feet of my lawn because it went in front of his house. It worked. So I'm not that concerned about the issue because I feel like we're addressing it
▶ 45:32 by continuing that wall. I know it's probably a bit outside the scope. I'm just worried about an adverse possession claim, which would significantly, well, not significantly, but it would narrow all of the specs and measurements that we're talking about. Oh, yeah. Okay. It's not before us yet, so it's fine. And I understand what you're saying here. I'd be more concerned if that neighbor was not making neutral to positive commentary. Right. So, Mr. Griffin, you need to request a continuance for the meeting in December, and you need to contact... When you revise the drawings, you need to contact Adam and ask him to withdraw the request for the variance for the driveway dimension between the two driveways.
▶ 46:49 So, just to clarify, and I appreciate your time, seriously, show the plans for the wall that's going to extend up past when the garage comes down- Yeah ... and the materials for the driveway, and then- Yes ... request to withdraw the variance for the driveways. Yes. Works for me. Hoping that gets you through nice and sooner, but... So, the next meeting, Adam, when is it? It's December 9th. So, Mr. Griffin, if you can just ask me to continue this hearing. Yes, please. Could you continue this hearing till I complete the required documentation necessary to move forward? Thank you. All those in favor by roll call of accepting the request to continue to the December meeting by roll call vote. Dan Gelormini?
▶ 47:48 Yes. Liz Ryan? Yes. David Roach? Yes. Chris Coughlin? Yes. Jeff Eugeno? Yes. I'm a yes as well. We'll see you again in December. All right. Thank you for your time. Have a good night. Thank you. Next up, we have case 26024, 310 Washington Street, requested to continue to today's date. This is the appeal of Rob Riley for variances from Section 235-6.2 and 6.3.D of the zoning ordinance for dormer length and number of stories to construct a full shed dormer onto the right side of the two-family dwelling at 310 Washington Street in Melrose, on a lot of... Lot consists of 8,499 square feet, shown on assessor's map A5010. Okay. I see Mr. Riley. Yes. And... Oh. You should see me. I'm not sure why you don't.
▶ 49:14 I do not see you. Ah, there we go. There you go. Okay. So, I saw you submitted additional documents. Why don't you tell us what we're looking at and what we are here today? I think when we left it, we had some concerns about the length and percentage of dormers that you're proposing for the house. And I do want to thank you in advance for just updating the documents and giving us some photographs to help explain the situation a little bit better. Yes. I took all of your feedback from the last meeting. I got back with Johnny Andrews, the designer, and we came up with something that I think alleviates a lot of your concerns. Adam and Larry were also nice enough to let me come in and speak with them to make
▶ 50:10 sure we're moving in the right direction, and they thought we were based on the comments. Yep. Am I able to share my screen, and I'll just go through it real quick? You can. How do I do that? Sorry. Adam, can you help? There's a button at the bottom of Zoom that says share, and it has- Oh, yeah ... like an arrow that points up. And then it should bring up another window that shows the document you want to share. Okay. And I can do it for you too. Would it be easier just to have Adam share the documents? Okay. Yes. I just want to go through them and just point out a couple things. Yeah. Yeah, I think that's fine. But Adam can put them up on his screen. Oh, okay. Great. Do you want to start with the photos or the plans?
▶ 51:12 Yes, please. Okay. The photos. Okay, that's the front of the house from the street. Yep. And you can go to the next one. That's the driveway side, so on that side would be the smaller dormer. Correct. Less than 50% on that side. You can go to the next one. That's the back of the house. You would see on the left side of what you're looking at would be the larger dormer. Yes. And as you can see, as the grass goes down to the left, if you see it on the next slide, I think it will be a better look at it. There we go. Mr. Gelormini had a question last time, and I wasn't able to explain it. We didn't have the correct plans with that. But you can see it's not even two stories on that side now. That's where we're going to be adding the larger dormer.
▶ 52:28 Those two small windows that you see, that's the basement apartment, which would be floor one. The other two windows are floor two, and then the dormer would be on that side. And if you just go down, next slide, please. I have explained that with the width of the house, it's more like a tunnel by the time you get into to have enough height to go through, and that is a 27-inch wide hallway, which is nine inches less than- How tall is the ceiling there? Right there? That's eight feet there. Okay. Thank you. And it starts to... In the next picture, you'll be able to see a little better. Yeah. I thought this was very telling. Yes. There's a few dents from my head on the top there over the last 25 years at the top
▶ 53:27 of the stairs. Mm-hmm. But as you can see, you need to come out 4 feet 6 inches from the wall on each side, from side to side, to get to 6'8" for the ceiling height. And the top of that stair, you see that little white strip? That is 3 feet 4 inches high when you step on there, from the middle of that strip to the ceiling. Mm-hmm. And going down, there's... Yep, next slide, please. That's going up the stairs. Mm-hmm. So, as you can see, the fourth from the bottom is where you hit seven feet of head space. Yeah. So, prior to that, the dimensions are... So, if you go the next step up to the top, it would be 6'3". The second step from the top, it's 5 feet 6 inches, and then the top step is only,
▶ 54:37 from the center to the ceiling, is 5 feet 4 inches. Understood. So, one of the reasons we need to request the dormer be longer is we need to start it there, because if not, I don't know if we'd get through the building department with the height requirements. So, I'm not gaining any space, any livable space there. I'm just gaining headroom. Adam, can we flip to the drawings for a minute now, if that's okay? I think we understand the issue with the stair, and I think, in fact, at the time, Dan's comments were not about not providing the dormer at the stair. It was just whether we needed to have that whole length. So, if we can just look at the plans, I think it would be helpful. Yep. So that's the proposed, yep, elevation.
▶ 55:41 Existing. That's the driveway side. And this is the driveway side with the smaller dormer. Yes, so less than 50%. Mm-hmm. And there it is there. So as you can see, it's not even two and a half stories. Maybe, I'm not sure what exactly two and a half stories is, but it would not be a third story. And what we did, based on the comments from before, is we took the dormer and we put it inside the envelope of the roof line, and then also brought it back from the edge and back from the peak. Yeah. Down from the peak a little. Yep. Okay. Yep. That's the back of the house. That's what it would look like proposed. And that's just the first floor. Yep. But this is the current, and that's... If you go back to X6 there.
▶ 56:38 Yeah. So right now, we have three bedrooms plus a laundry room with a small closet. And what we're doing is, I think a master bedroom was mentioned last time, but it's only going to be 10 by 14, so it's really not a master. But what is here is three bedrooms, and we're going down, if you go to the next slide, we're actually losing a bedroom. And another comment from before was to make the office smaller, and that's a very small office. I can't see the dimensions from here. But it's just enough basically for a desk and a file cabinet. Yeah. It's 6 by 7 or something like that. Thank you for allowing me. That's why I wanted to share my screen, so I could handle the logic, so I could see. But the master bedroom now, it's 152 square feet,
▶ 57:35 so it's- Yep ... not many people would consider that a master. And we brought in the roof, the dormer from the front, we brought in four feet, that's those inside dimensions. Yep. In the back, we were only able to take it in two, and the reason for that is if we went in any more, we would just lose so much of the bedroom size. We have, again, you can see the two windows there. Yep. So the bed would go there, so it's barely enough for a queen or maybe a king-sized bed. And then to the side, we would just put a cabinet or a nightstand or something under there. But with the width and then the location of the stairs, there's really not a whole lot of room to play with. I understand Ollie, he didn't want the full dormer, and we did make the changes
▶ 58:30 that he requested, I believe. Board members, any questions for the applicant? Where's the current shower or tub? In the living room, on the main floor. It's in the design. So there is not a second bathroom upstairs? Yes, there's just a laundry room and even the washer-dryer up there. When I buy a washer and dryer, I have to measure it and make sure it's less than 29 inches wide because it has to get through that hallway that I showed. So it has to actually go straight and then sideways and then straight through the doorway. If you go back a little bit more, we'll get to the second floor and I can show you where the current bathroom is. We're looking at the existing second floor. No, I'm sorry, the first floor.
▶ 59:30 Yeah. And so it's for the- It's for the bathroom ... it's for the apartments. Yeah, so that's the first floor. The kitchen, we're sitting right there now at that island, and there's a bathroom. The living room, it used to be two rooms. We took down the wall between it, but still, it's only 239 square feet. And that's so if you have company and you're coming out of the shower, you have to be a little discreet going up the stairs to get there and- Understood ... as we've been here a long time, we'd like to stay here, but as we age, we could really use a bathroom on the same level as the bedrooms, as you see. My wife nodding over here. And we started out with a bathroom, and just with the way the roof line was and the
▶ 1:00:21 width, there was just no other way to do it. Okay. Any other questions for the applicant, or is there anything you'd like to add before we open the hearing to public comment? Okay, hearing none, let's open the hearing to public comment. Is there anybody who would like to speak in favor or opposition to the project that we're speaking about? Use the raise your hand feature or email. Anybody? I don't see anyone. Okay. And we haven't received any new emails, just the packet from the last hearing. Yep. Okay. Well, I think, absent the board having any other questions or comments, Dan, did you have anything you wanted to add about the length of the dormer? No, I think I understand it. Thank you. We're going to close the public hearing,
▶ 1:01:49 and I think we're ready to deliberate, unless you'd like to add anything, Mr. Riley. No, I'd be happy to answer any questions you may have. I took everything that you said under consideration. I definitely understand that, and we appreciate that. Okay. Oh, do we have to read anything in from Public Works on this one? We did get a letter. Did you get a copy of the letter from Public Works, Mr. Riley? Yes, I did. The one thing that they did mention was the sewer line was replaced at the same time that the water line was replaced in 2016. I'm not sure if he... Barry Greenwood did it, and he did both at the same time. He was doing the sewer line, so it is PVC now. It's not the old clay. So I don't think there's any issue.
▶ 1:02:49 There's just some standard boilerplate components of that letter for your record. I mean, there's probably a... I can't remember. There's a usage fee associated with adding the bathroom, I guess, but- Yeah, there might be. Yeah. Thank you, David, for that. So board members, time to deliberate. Any thoughts, comments, questions? Tell me what you're thinking here. Looks a lot better. I think the pulling in makes a huge difference. It is in excess of what the code set or what the requirements are, but I think this is a case where, why we have the board to look at these and understand that there are extenuating circumstances, and I don't see an issue with this. Yeah, Brian, Chris, I agree. I think just subtly stepping it back and sliding it
▶ 1:03:54 over a little bit makes a huge difference. Makes a huge difference. Does make a huge difference. Yeah. Yes, after the last meeting, when I walked my dog around the neighborhood that day, I looked at every single house within a one-mile radius, and I did see exactly what you were talking about. There really wasn't- ... ending with a third story. There were a lot of dormers added in sometime in the last 100 years, but that's what we tried to meet, was what the rest of the neighborhood looked like. So board members, are we ready to vote? Okay. For the appeal of Rob Riley for variance from Section 235-6.2 and 6.3D of the zoning ordinance for dormer length and number of stories to construct a full shed dormer
▶ 1:04:46 onto the right side of the two-story dwelling at 310 Washington Street in Melrose, based on the updated drawings of 11/10/2026. All those in favor by roll call vote. David Roach? Yes. Raj Singh? Yes. Liz Ryan? Yes. Jeff Eugeno? Yes. Chris Coughlin? Yes. Daniel Ermini? Yes. And I am a yes as well. Your variances have been granted. You can talk to Adam for what the next steps are. All right. Thank you very much. I appreciate it. Thank you. Thank you. Have a good night. Okay. Next case, 26020R, 24 Ellsworth Avenue. The appeal of Red Spade Development LLC for approval of a major revision to a previously granted special permit to construct an addition in the non-conforming front and side yard setbacks of a
▶ 1:06:05 single family dwelling. The major revision to the project involves demolishing the existing structure, constructing a new single family dwelling that adheres to the same plan as was previously approved. Project is located at 24 Ellsworth Avenue in Melrose, a lot of 3,781 square feet shown on assessor's map C12055. Good evening, Mr. DeMarco. Good evening, Mr. Chair. Good evening, members of the board. Roberto DeMarco here on behalf of Red Spade. We previously came before you, and the documentation hadn't been delivered in time, and there was a question as to whether or not this should go forward as a major change versus a minor change, due to some of the issues surrounding the reason we're here. My clients received approval for this project, and
▶ 1:07:13 they were to retain the first floor. The issue is that they were not able to, and my client is here, and he's willing to talk to you as well and testify. They were not able to see everything. The sill, the property, it was a home. It had various design elements covered. They didn't see the internal rot, and when they opened up the walls and began doing the work that would have kept the first floor and delivered the design as approved, unfortunately, they discovered that it was not possible. The structural engineer did look at it. You've been provided with photos in his letter concerning this. There is, and I want to stress this, the finished product is going to be exactly what you approved, with a minor change that raises the
▶ 1:08:14 level one row of cement cinder block in order to create a separation for protection of wood elements from bugs and water, et cetera, et cetera. As the structural engineer notes in his letter, the work here is necessary to make this work within code. So, what we're asking for is an approval of this change. The project will not, I stress this, will not change the setbacks, will not change the height, will not change the exterior. It will be the project that you approved previously. It's just that they had to rebuild the first floor. The problem is they should have come to the building department when they discovered the rot, and they had an overzealous builder who just kept acting to take things down, and he was stopped.
▶ 1:09:25 A stop work was issued, and here we are. So, we're asking for your approval. This is the same project that you've approved before, and we're here to answer questions. My client is also in the audience, and Mr. Marcoux will be happy to explain to you what he discovered and what happened that night, if you'd like to hear it, that day. Adam, I have a question for you. I haven't seen the letter. Is this the information that came late to the board? No, I think this was also- Was the letter included in the documents here? Yeah, let me just... Hold on one second. While we're looking for that, board members, do you have any questions for the applicant at this time? I just want to make sure we have a copy of that.
▶ 1:10:50 Certainly. If I can share my screen, I can show it so that maybe Mr. Forrester, if he sees it, it's from Structural Integrity. It was issued on October 14th and delivered at the time. Yeah, so last meeting, I was out as well, so- Oh. Let me just dig through my files here. So, is it sent from you or from the applicant? It's from Structural Integrity. It was issued by me to the... sent to you from my email, Roberto. Okay. Yeah, like I said, I was out last time, so let me... And Mr. DeMarco, I think my recollection, and I think you may have just said, the existing foundation walls remain the same, but for the additional amount put on top. That is correct. We're adding a course of cinder block in order to solidify
▶ 1:11:58 what's there, so the foundation will stay the same. Yeah, we received that letter on October 14th. Okay. So, the building department will see that as well, so... Okay. Is there anything you would like to add, attorney? No, once again, when these issues come up and somebody starts work before they get approval, it's always a question of apologies, and we are very sorry. Mr. Marcoux does not do business that way, and he is very... Like I said, he's here if you'd like to hear it from his lips. Okay. Board members, any questions for the applicant? Were there any letters in support, especially from the zero setback abutter? Oh, we saw this project. When did we see this? So, I don't have any public comments on file for this.
▶ 1:13:20 To answer your question- I don't remember there being issues with it, Raj, at the time. It was in June, I believe, was your initial approval. Yeah. Yeah, I'm saying for the major modification, like for the- Oh, nobody's written for the major modification. No. And we've already approved the project. Yeah. So we're not going to relitigate that. So it's really just- I don't quite understand why it's back before us. Because- Because they had to do more construction, basically. Yes, that's right. More construction and I think what could have happened is they could have built something different once they found out that the foundation was not sufficient. That would have been a risky move. But they didn't, so we're seeing the same plans and everything?
▶ 1:14:23 We're seeing everything the same. Mm-hmm. And- Yeah, okay. So no change in the type of- I'm going to say it's going to be maybe eight inches higher, but maybe not, depending on where the last course of stone foundation is. So it might be at most eight inches taller. That is correct. Assuming you're going right to the top of the wall and putting a block in, the block's going to be there to support the floor framing. It needs to be there to secure that. Yes. Yeah, to piggyback on what Raj said, I'm just going to state for the record, it doesn't appear to me that they really need to be before this board. I think this could have been resolved with the building department. But otherwise, I will, of course, support-
▶ 1:15:22 Yeah ... the relief requested. Yes, I think there probably was some internal debate in the city about the definition of a major- Can I say? Yes, Adam. I think it was because... So this is a preexisting nonconforming, right? So before, the project was presented as an addition, but then they found an issue, right? So now it's a demo and a rebuild. Mm-hmm. Yeah. Not to... I think that's what- Yeah. But so normally- ... the issue was- ... go to the inspector, say, "We found a deficiency. We want to demolish and reconstruct it. Can we have permission to do that, acknowledging we're demoing the nonconforming condition and reconstructing it?" Right? That's not the petitioner's call to make. Okay. Just because, only because there was relief granted on that basis.
▶ 1:16:32 So it was the right thing to do. Moving on. Even though it seems like a waste of our time. Are we ready to vote? I think so. For case 26020R, 24 Ellsworth Avenue, regarding the appeal of Red Spade Development LLC for the approval of a major revision to the previously granted special permit to construct an addition. Brian. Yeah, I can't read all that. Yes? Did I freeze? You froze. Adam froze. I wanted to tell you something. You froze. Did I freeze? No, no, no. Hold this in suspense. He froze. Guess you're going to have to continue. Okay. All those in favor of granting the appeal of Red Spade Development for the approval of a major revision for a previously granted special permit to construct an addition
▶ 1:17:45 in a nonconforming front and side yard, single dwelling, and to increase the amount of construction based on... I'm not going to read that. Okay, I'm going to try one more time. He's gone. The appeal of Red Spade Development LLC for approval of a major revision to previously granted special permit to construct an addition on a nonconforming front and side yard setback of a family dwelling at 24 Ellsworth Avenue in Melrose on a lot consisting of 3,781 square feet, shown on assessor's map D12055. All those in favor of granting- Sorry, Brian. My internet went down. I was trying to ask- You did? Yeah, I'm back now. If we open public comment, if anyone is here to speak on this case? Did we already do that?
▶ 1:18:51 We did. Okay. We did. Is there anybody here, Adam, that wants to talk about it? I don't want to preclude that, but I did open the hearing to public comment. Okay. I had some tech issues. Sorry. Okay. So now I'm going to ask you how we want to frame this. Are we just deciding that this constitutes a major revision in granting the approval? Is that what we're doing? Yes. Okay. I'm going to do it one more time, and this is not going to be my best moment here. The appeal of Red Spade Development LLC for approval of a major revision to a previously granted special permit to construct an addition in a nonconforming front and side yard setback of a single family dwelling. The major revision involves demolishing
▶ 1:20:01 the existing structure and constructing, in essence, a new single family dwelling that adheres to the same plan as originally approved. Project is located on 24 Ellsworth Avenue in Melrose. All those in favor of approving the major revision by roll call vote. Chris Coughlin? Yes. Raj Singh? Yes. David Roach? Yes. Dan Eugenio? Jeff Eugenio? Yes. Liz Ryan? Yes. And I am a yes as... Dan Delormier, don't want to forget you, Dan. Yes. And I'm a yes that approval has been granted. Thank you, Mr. Chair. Thank you, members, and hope you get to sleep early tonight. Working on it. Have a good night. Thank you. Thank you. Okay. Next case, case 26028, 390 East Foster Street, the appeal of Steven and Kimberly O'Connor for a special permit
▶ 1:21:07 under Section 235-6.2 and -12.5 of the zoning ordinance to construct the second floor to the single family dwelling, which is in the nonconforming side yard at 390 East Foster Street in Melrose on a lot of land consisting of 4,469 square feet, shown on assessor's map F8036. I see the applicants here. How are you doing tonight? Thank you for your patience. Why don't you tell us why you're here? You mentioned, we're here to expand our home, add a second floor, or a full second floor to our existing one and a half story home. The second floor, prior to us buying it, or the top floor was renovated, but there's a lot of knee walls and there's not much room. So as our family is growing, we were hoping to have the house grow with us.
▶ 1:22:16 Okay. Do you want to tell us, or Jay, do you want to take us through the drawings and tell us what you're doing? Sure, Ryan. As you can see on the right side, we have a seven-foot setback. That's why we're here. It's existing non-conforming, and we also don't meet the required lot cover. Yeah. So we're here. Essentially what we're doing, and that's the lot. We're not expanding the footprint at all, as Steven Kim said, but we are... I'm going to stop sharing this and share this instead. Sorry, let me get out of this. So this is the second floor plan. They currently have four bedrooms and one and a half baths. They have two bedrooms, open sitting area, and an existing bath here. And what we're doing is just expanding the full-height walls
▶ 1:23:36 to create a, sorry about this, primary bedroom, walk-in closet, another full bath that will be shared, replacing the existing half bath, and then two bedrooms on the front of the house. And this is essentially what the house looks like right now. You can see there's a single room off the right-hand side and the two bedrooms and bath. And then, let's see, let's leave this open here. And as you can see, we're just raising the roof and- Oh, we're having some trouble with your audio there. As you can see, we raised the walls. We did sort of a false gambrel at the front entry to give it some interest because it is a long, narrow house. Yeah. And then there's another three bedroom with a single large bath on the
▶ 1:24:45 front. We did add a little decorative element at the front entry, but that's there and all that's within the setbacks. And this is just a spin around the model. Yeah. The house is going to be completely have the siding completely replaced and all the windows completely replaced, new ones on the upper levels, and it'll be fully somewhat sustainable in terms of its overall barrier coverage- Yeah ... and insulation. Okay. Board members, any questions for the applicant at this time? Okay. Jay or Mr. and Mrs. O'Connor, are there any questions, anything you would like to add before we open the hearing for public comment? No, I think we're all set. Okay. We are going to open the hearing for public comment.
▶ 1:26:05 Anybody interested in speaking for or against this project, please use the raise your hand feature or email Adam at appeals@cityofmelrose.org. I don't see anyone. Okay. And no emails as well. Yeah, I didn't see anything. Anything you would like to add before we deliberate? Are you asking the homeowners? I'm asking you. I'm asking the homeowners or you, Jay, if there's anything you would like to share with us. No, I really think that this is a no-brainer. We just missed the 75%. We're six inches off on the right-hand side setback. I don't think, and we don't impede any of the height restrictions. The neighbors are not in protest at all. And I think this is a much more handsome addition to the street.
▶ 1:27:15 No offense to the existing house. Understood. But I think it really fits into the fabric of the neighborhood in Melrose and as a whole. So I couldn't make this any easier for you guys tonight. That's what I'm thinking. Appreciate that. Thank you, Jay. We want the truth. And you've received a letter from the Department of Public Works regarding any assessment? I did. Okay, great. Thank you. I don't believe there was anything outstanding in terms of tax or anything. No. Okay, so we're going to close the public hearing. And board members, I think we should deliberate. Don't all jump in at once. I think it's a modest ask. It looks good. I agree. It's considerate of the neighbors. Yeah, I think it's
▶ 1:28:12 pretty straightforward from my perspective. What Dan said. I agree with Dan as well. Okay, board members, are we ready to vote? Yes. Okay. In the case of 26028 390 East Foster Street, the appeal of Steven and Kimberly O'Connor for a special permit under Section 235-6.2 and 235-12.5 of the zoning ordinance to construct a second floor to the single family dwelling with a non-conforming side yard at 390 East Foster Street. All those in favor of granting the relief by roll call vote. Dan Gelormini? Yes. Chris Coughlin? Yes. Jeff Eugeno? Yes. David Roach? Yes. Raj Singh? Yes. Liz Ryan? Yes. And I'm a yes as well. Your appeal has passed. Thank you. Speak to Adam about what the next steps will be.
▶ 1:29:26 All right. Thank you guys for your time tonight- Thank you so much. I appreciate it ... and your approval. We appreciate it. Thank you. Thank you, everyone. Have a great night. Thank you. Okay. Case 26029 8 Hancock Street, the appeal of Zeen L. Abedin Bel Kayat. Okay. What? Okay. Okay. Yes, thank you. For a special permit under Section 235-6.2 and 12.5 of the zoning ordinance to construct an addition in the non-conforming front and side yard setback of a single family dwelling at 8 Hancock Street in Melrose on a lot of land consisting of 7,600 square feet shown on assessor's map F309495. Good evening, Mr. Chairman. How are you? Good evening, Attorney Lucas. And I see the applicant is here as well.
▶ 1:30:31 Yes, Mr. and Mrs. Bel Kay are present. Longtime friends and clients, and they have purchased a home at 8 Hancock Street. They're building an addition onto it. The issues we have that require a special permit is we have a non-conforming lot area, non-conforming front and side yard setback. So those are being somewhat extended. You should have all the materials in front of you. If you'd like me to share my screen, I can start going through some of the sheets. Yeah, why don't we do that? Okay. Here's a plot plan to show you what's going on here. I'm assuming everybody can see this. So as you can see, the addition, it's greater than 500 square feet, which requires a special permit. Here we have a non-conforming setback.
▶ 1:31:40 We have a garage that's going to be removed at this time, because what we will have is a two-car drive. This will be a garage and a bedroom-bath suite above it, and I'll get to that. I already told you we have a non-conforming setback on the house, the front yard, which is 11 feet. This will be a little bit more conforming, but still within the non-conforming area. This is what the house looks like currently. Mm-hmm. I can show you... Can you see this Google map right now? Yes. Okay. So this is 8 Hancock Street. As you can see, the house is set forth on the left side of the lot. It's probably, back in the day, was probably considered a double lot or something like that. Mm-hmm. Here on the assessor's map, you can see where it's set.
▶ 1:32:41 This is one of the bigger lots in the neighborhood. However, this is a 15,000 square foot requirement because of this. We are in the SRA district, so we're in this little panhandle kind of thing, which treats these lots the same as these over here, which is why we have a non-conforming area. Back to the plans. I just want to show you the elevations first to give you an idea. This would be the front yard. What were you saying? I'm sorry? Sorry. Are you saying the zoning map looks gerrymandered? I didn't say that. Listen, I've seen this for so long. This happens all the time all over Melrose. It is what it is. But this would be the new front yard, as you can see. What we have here, and I heard you earlier asking somebody about materials for
▶ 1:33:43 permeable material in the driveway. Mm-hmm. This would be permeable pavers in the front yard. It would be a two-car garage. As I said, there is a bed-bath suite here. The side view, you can see here, this is a little bit misleading because this looks like it's on a corner lot or something like that, and that's not the case. This is, as you saw earlier, there's a wide green space here between this and the next lot. This house would be 15 feet, well, actually, might have been 20 feet. Let me be accurate here. Oh, yeah, 20 feet from the lot line is what you would see. And in fact, if you look at the assessor's map, the next-door neighbor's house is all the way to the other side of the lot. This is a driveway. So you can imagine we're going to about 20 feet,
▶ 1:34:45 almost the same, at just about the same width of the current house is what we would be extending. Mm-hmm. This is going to increase the beds and baths. These are just the existing floor plans, as you can see, very basic. I want to get to the proposed. Here we go. So you see the two-car garage, a new finished basement here. This is the ground level, of course. The first floor plan, the garage has a high ceiling. You'd have your living room, dining room, kitchen, et cetera. This is the bedroom suite I told you about. So there'll actually be two master suites, therefore, on the second floor. So a total of four bedrooms. Oh, sorry, fifth one. There you go. I want to get back to the elevations. I do have, excuse me, a replacement sheet
▶ 1:36:19 for this view here that I wanted to show you, which is this. The main difference being, you will see here that there was the potential for a retaining wall here, probably about three feet high. We feel we probably don't need that after all. We weren't sure about if there was going to be enough grading that would require some kind of retaining wall, but the applicants decided they don't need that. So I believe that's the only difference on the sheet that I just emailed it to the Board of Appeals today. I would say that the elevations kind of speak for themselves. I can, picture can describe it better than I can. I'd love to hear any questions that you have. Well, I know this location pretty well. This is
▶ 1:37:27 my neighborhood. I love it to hell. So it's known as Bob's house for a while. And it is unusual to this neighborhood. As I said, Hancock, especially as you go up the steep part of the hill, probably a lot of really small, tight together houses. And this house, close to the side of it, are much more generous lots. Yeah. This neighborhood does have on Spear and at the top of Hancock, a little bit more of a parking challenge than this area does here. And I actually think this is going to represent an improvement to pulling the driveway to a two-by-two wide drive with a double car garage there, versus where people tend to just park on the sidewalks all over the place out here with smaller driveways. And then-
▶ 1:38:22 I was not aware of that. And additionally, yeah, and additionally, where the driveway is today, that intersection is tough. So pulling the driveway away from that, I think, would represent an improvement. So, I mean, I- I see what you're saying, yeah. Yeah, I actually got hit by the neighbor across the street at that corner. So, back and onto the driveway. So, I think spreading it out, I think that would be an improvement for this location. And for reference for the members of the board, this is right, if you look behind it, that's the crazy house on the cliff that we approved the lot next door to. So, it'll bring it back. Everyone remembers that one. I don't know. Renee might remember the address of that, but who's on here right now, but I don't
▶ 1:39:19 know. It's Temple Street, 7 Temple. 27 Temple. Not that house, the lot next to it, we had a whole thing about that. Oh. They're trying, they're still, for the last year and a half, been attempting to build a house on the cliff back there. Oh, I see. I have a question about the height, and it is related really more to the door under the main entry. That's all existing to remain, right? That's there today. That deck is there. Is there a door underneath there like that? I don't know the answer to that. There is. I can tell you there is because I see it every day. Thank you. Zane is on here. He could answer the question, but okay, I can see it hidden in there. Okay, I got it. So, the shrubs are all cleared out. He started clearing the property out.
▶ 1:40:25 It just- Hardly ... looks a little... Right. It's- It's more grade than I thought in that front planting area. That's all. It's significant. Yeah. David, any- It's actually a legitimate walkout. Once he opened that up, the slab elevation is actually higher than the street. David, any concern about the depth of the driveway and overhanging that sidewalk since that's the only side of the street with a sidewalk? So we'd have to look at that dimension. That's a good question. As long as he can get a car. What's the best word? Maybe a plot plan? Plot plan. Plot plan. I think it's 15.9 to the door. And then 12.5. I guess the question is, where's the street relative to- Where's the street relative to where the iron rod is? That's the...
▶ 1:41:27 Let me see if I have that. I don't know if I have that on here. Let me see. If that is an accurate rendition. I'm not going to say that that is. I understand. Renee, Zine, do you know the answer to the question? Hi, everyone. Can you repeat the question, please? Yeah. They're looking for essentially how long the driveway is to the street. No, other than the- To the sidewalk? Well, there is no sidewalk. There is no sidewalk. Yeah. Okay. Well, there is a sidewalk. There's a sidewalk. Where's the property line? There's a sidewalk that all the- Everything else. Hi, Dave, Richard. How are you? Still no more better. I can share my screen. I can share my screen if you want. Oh, that sidewalk. Yeah.
▶ 1:42:40 Should I stop sharing mine? Yes, please. Yeah. And then we can go- I don't believe the sidewalk is tight to the property line. I think there's a little space. This looks more realistic- Oh, there you go ... than the street view, so. And that sidewalk is not your property, as far as you understand? Correct. Yeah. Okay. Yeah, it's definitely not that. That's where the hydrants and stuff are. Yeah. Okay. It's likely, because in this neighborhood, you can see the retaining walls all kind of follow the back of the- Yeah ... the side of the property line there. So that's probably what that 15.9 is. I repeat, the issue is, there are houses that don't have driveways here. There are ones that don't have any parking, and that's where the problems come
▶ 1:43:44 from. So, I'm less concerned about it personally, but I don't know about other board members. I'm just concerned with that many bedrooms that at some point it's going to be a certainty that there's people parking in the driveway, and if that's the only means of pedestrian egress up and down the street, with that type of driveway, it's probably going to overhang the sidewalk. The length of the driveway, I think you could park even two cars in front of it, in front of the garage. Yeah, that's my concern is that the length of the car... It's 15.9 to the door. Yeah. So, a car is almost certain to overhang, and you're not going to touch the door, so a car is probably likely to overhang the sidewalk based on those measurements.
▶ 1:44:45 Oh, I got the opposite impression. Yeah, that's because you were looking at the rendering, not the- No, I was, yeah, looking at the overhead. Well, in any event, the plan is not to park cars in front of it. I'm just thinking you could probably fit them there if you had to. There's a lot of bedrooms, so I would imagine there's going to be more than three cars at some point, or more than two cars, rather. Okay. I don't know. Plenty of... I don't know. Go either way on that one. Yeah. Any other- I guess the other challenge with that is, what is the relief requested, right? And what do we have for, I guess- Well, it's constructing an addition, non-conforming front and side yard, and lot coverage.
▶ 1:45:52 Yeah. Lot area, excuse me. Yeah. And the bottom line is it's a special permit, so the change must not be substantially more detrimental than the current condition, so. Board members, any other questions for the applicants, or anything that you would like to add, Attorney Lucas or Zine? I don't think so. If Zine or Renee want to add anything, I'm happy to listen to them. No, we're okay. No, we're okay. Okay. We're going to open the public hearing portion of the meeting. Anyone who would like to speak in favor or in opposition to the proposal being presented, you can use the raise your hand feature or send an email to appeals@cityofmelrose.org. Seeing anybody there, Adam? I don't see anyone. I don't see any emails.
▶ 1:46:58 We received one that I sent to the board previously. And was that... That's the fairly extensive one, isn't it? It's fairly extensive, yes. That's true. So, I sent it to the board members. Yes. Have people had a chance to review this, board members? And I guess this other question is, has the applicant seen this letter? I definitely have not. Adam, you didn't send it to me, did you? No. Too many megabytes? It's a public comment, so you're going to get it here now. Okay. The letter suggests, Attorney Lucas, that they've communicated these concerns to you directly. Okay. It's the abutter at 18 Hancock Street. Yep. He reached out to me, and- Okay. No, go ahead. Sorry. I was going to say, he mentioned a bunch of things.
▶ 1:48:13 He was concerned about the retaining wall. I showed you that they're removing that because they don't think they need it. He said he wanted a structural engineer to certify under pains and penalties of perjury that excavation isn't going to... I don't know. Hold on, let me show you right here. I believe this is his house here. Mm-hmm. So he was concerned that excavating here, he wanted a structural engineer to certify that it's not going to do anything to his structures, and I kind of said, I didn't really think it was, given what they're doing, not really necessary. They're not blasting. It doesn't really make sense to spend thousands of dollars to prove a negative. I know he wanted some trees to be left.
▶ 1:49:10 Yes. We can't really... This, to me, looks like a giant holly bush. It's gone. That's got to go. All right, good. All right. That was where all the birds lived that would poop on you when you walked down the sidewalk. He asked about a row of arborvitaes along the property line. He's talking about the row that's... It runs perpendicular to where you're standing right now. There's a massive run of- ... green giants along that part there. Yeah. I mean, my suggestion is I'm sure that the Belkies want their own privacy, and they're probably going to maintain green space regardless. I wouldn't suggest a condition that says they have to take down... Or that they can't take down what's there. Who knows what could happen?
▶ 1:49:58 Yeah, I could read the short summary of what he sent, if that's helpful. I think that would be helpful. Okay. Okay. Okay. So, this is from the owner of 18 Hancock Street. They don't oppose the addition to their neighbor's home. They just ask the board to consider some conditions approval. In short, they ask the board to require that a row of arborvitae near my lot line be protected and kept, require a grading plan before a building permit, and limit the retaining wall on my side, require shielded downward-facing lighting on the garage and driveway, consider a roof on the garage block with no gable end facing my home, and require a surveys plan confirming the building's height and number of stories.
▶ 1:51:04 And their name is Ela Lovish, 18 Hancock Street. So, that was the summary- Okay ... of that letter. Thank you. You're welcome. Yeah, I guess, maybe, do you want to talk a little bit about that elevation that faces your neighbor? It seems like maybe you could provide some sort of design relief. I mean, there's no windows on that flat wall above the first floor, so it is a pretty tough elevation. Do you want to talk about- Obviously, the question is, before that, Dan, the question is, does the neighbor want privacy, right? Or do they already look at it? I thought the same thing, Mr. Roach. He was asking for arborvitaes, and he wants to change what the building looks like. So, I don't know if we can... If both things-
▶ 1:52:00 Both things can be the same. Can be, I mean, the- No, I was suggesting that adding windows might take away from the concept of privacy, so, like, let's just not be careful. Maybe, but I know I wouldn't want to look at a 35-foot-tall blank wall. I think that's just- Yeah. You know. It's due to the primary bathroom and the walk-in closet are where that blank wall- Yeah ... is. But the arborvitaes are shielding that, and we have intention of keeping trees. It's just- You're right. I mean, you've got to... There's enough space to plant a buffer, but a privacy buffer in that location. Yeah. By past the... Beyond, you've got like 16 feet or something like that beyond the- Correct. It's 15 feet from the building to his lot line, which I'm assuming is
▶ 1:52:55 probably where the moat area is. Well, it's around there somewhere. Right. And you can imagine this, the butter has some sensitivity because if you look at that hill behind you there, it looks- Yeah ... very different. Yeah. Not in a good way. I'm not sure. Well, I guess we're not there yet, but I'm not sure if they're here or want the same thing, but I guess we can wait for that. Oh, we are in the public hearing phase, and they're not here. Oh, okay. Nevermind. They're not here. Yeah. Yeah, they sent in a- They sent a letter ... a pretty lengthy letter. And- Yeah ... that was the summary of it. Right. And when I read through that letter, the evergreen screen was the thing that made the most sense.
▶ 1:53:51 I guess the first question is, which property is it on? I don't even know if it's... I assumed that was on the neighbor's property, but maybe- The trees are on our property. Yeah. Yeah, I think they're on this lot. They are. I don't think they were planted by the previous owners. They look too big. I double-up-played those. Okay. Oh, yeah. Okay. Yeah. Well, these ones are definitely. Yeah. Okay. What is the intention of grading in that back corner of the site, towards 18 Hancock? Hang on. I have a plot plan. I have a patio shown here. Yep. So, I think one of his issues is about grading. Is there any general thought about what the grading would be like in that corner of the site? Zane, can you answer or anything?
▶ 1:55:08 Yeah, I think we're just trying to make as much level green spaces or semi-level, for envisioning of kids being able to play back there. Yeah. Okay. Thank you. Mm-hmm. Okay. Board members, any questions for the applicant before we deliberate? Dan, you have some que-- Did you want to bring up some design issues related to the space? No, I mean, I think the only thing that jumped out at me is- That wall ... what you had said. Yeah, it's- Yeah ... it's tough when you have that big of a facade without anything, any articulation. Yeah, I agree. Any other comments? Questions? Would the applicant like to add anything before we close the public hearing? I don't think so. I appreciate the feedback. Okay.
▶ 1:56:24 Okay. Public hearing is, public portion of the meeting is closed. Board members, what do we think? My only concern is what I voiced. I just don't like when things are built with the possibility of infringing on the use of what is the limited public space for, especially for pedestrians on that hill. But David knows that area better than I do, so. The sidewalk I walk every day. I'll be walking it in an hour, hopefully. Yeah, my comment was directed mainly towards the fact that this does actually provide more parking than most of the other houses do. I get what you're saying. If it's 15, 9 plus what looks like a couple feet, yeah, if they park an F-150 in front of that garage, it's going to stick out.
▶ 1:57:32 We don't all drive those big trucks there, David. Well, I do though. And it's 19 and a half feet. It doesn't fit anything. Yes. But, that is a valid comment, but I guess it's not necessarily... It's not related to the actual non-conformity, and I wouldn't say it's substantially more detrimental. I wouldn't say it's a definitive improvement, but I'd still, from my perspective, this is an improvement to this location. I agree. It's a beautiful house. I would disagree that it's not related to the non-conformity, but the extra space in the front to the street would allow for additional parking. But it's your neighborhood. I'll defer to you on it. I guess I was just saying where the setback that's in non-conformity is the
▶ 1:58:28 left-hand side of it. That's it. Yeah. Anyway. Yeah, I'm comfortable. Any other comments? Board members, thoughts? Okay. Do people think they're ready to vote? Yes. Okay. In the case of 260298 Hancock Street, the appeal of Zeen El Abidine... Ah, I'm horrible at this name. Go ahead. Can you just pronounce your name? Zeen El Abidine Belkaid is his name. Zeen El Abidine Belkaid, if you want me to say it with the accent. Zeen Abidine Bel- Zeen El Abidine Belkaid. Belkaid. Yeah. For a special permit under... I'm just going to leave it at that. For a special permit under Section 235-6.2 and Section 235-12.5 of the zoning ordinance to construct an addition in the non-conforming front and side yard setback on the single
▶ 1:59:48 family dwelling at 8 Hancock Street in Melrose. All those in favor of granting the special permit by roll call vote. David Roche? Yes. Jeff Eugeno? Yes. Raj Singh? Yes. Chris Coughlin? Yes. Liz Ryan? Yes. Dan Gialmarini? Yes. Brian Thorpe, I'm a yes. Your special permit has been granted. Great. Thank you all very much, and appreciate all the feedback, as always. Thank you. Thank you very much. Thank you. And good luck. Thank you. Okay. The last case before the board tonight. Case 260306 Black Rock Road, the appeal of Bun and Mary LLC for a special permit under Section 235-6.2 and 235-12.5 of the zoning ordinance to demolish the existing single family dwelling and construct a new single family dwelling on the non-conforming lot at
▶ 2:00:59 6 Black Rock Road in Melrose, on a lot consisting of 7,150 square feet and shown on assessor's map B4017. Yeah, is the applicant here? Because I have an LLC on the application, so... Okay, there we go. They're being promoted. Great. Yeah. Hello? Hello. Hi. Hello? Good evening. Yes, we can hear you. Can you hear us? Yes. Okay. Why don't you tell us why you're here today? Hi, board member. I'm here today to basically propose constructing a new single family home, second story. So, is it... You're demolishing the existing building and building a new single family, is that correct? Correct. Yes. Okay. Do you want to show us the drawings or explain to us what the project entails? Yeah. So basically, the drawing shows for the house plans itself, it's
▶ 2:02:49 basically it's- Do we have drawings? I can share them on the screen for you. Yeah, please share them on the screen now. Do you want me to start with the plot plan or the architectural plans? I'd start with the plot plan first. Oh, okay. Can you see that? Do you want to explain your project? Yeah. So basically, we're trying to increase the square footage of the home, adding a two-story dwelling unit with a basement, adding another two-car garage in the side. So on the side setback of Groveland, we brought it to 17 feet, and the front of Black Rock is 25 feet frontage, and the side of the next-door neighbor is 11 feet setback. In the rear, we have 20.5 feet setback. And so, Adam, the relief that's being requested is, it's a corner lot,
▶ 2:04:49 but is that the setback? So it's lot area and lot depth, but they're proposing- For new construction? Yeah, and they're proposing the new structure is going to be at conforming dimensions. So, the request is that the special permit is for demolishing and then constructing- Okay ... the new single family on a non-conforming lot. So- Got you ... those are the two issues, lot area and depth. Okay. Okay. Board members, any questions for the applicant right now? Okay. Do you want to run us through... Can we just look at the floor plans for a second? Oh, I can't... I'm not... Love the diesel wagon in the driveway. It's just a drawing. No, I know. It's just funny. Yep. Let's get past... Let's- So just let me know what sheet you want to be on that you...
▶ 2:06:36 What part you want to talk about? Basically, I will talk about the first floor itself. So basically, we're just on the first floor. It's about 1,248 square feet. It's just basically a living room, family room, kitchen, and a dining room, mud closet going to the garage. And on the second floor, it's a four-bedroom with 1,802 square feet, with a master bedroom, walk-in closet, and the other three bedrooms basically just 13 by 9 regular bedrooms with a bathroom and a laundry. I will take any questions if you have any questions for me. What's the relief again? Roof. It's to take down the existing house. Yeah, I got that. But what's the... The lot area and lot depth. But the new house is at conforming setbacks.
▶ 2:08:14 Yeah, I was going to say. So it's just basically that you couldn't build anything because the lot doesn't even meet minimum lot size. Yes. Yeah. Without the special permit. Right. And so the question really then is, is the expansion appropriate for the neighborhood? Is it... On one hand, it feels like a big house, and then you look at the numbers, and honestly, it's not as big as it looks. And I think one of the things that's of note is the 26-foot depth dimension is, it's a pretty narrow house for a big house. Yes. That's probably the reason why, because we couldn't get the 20 feet setback. We try and get the 20 feet in the back, put a setback into 20 feet. You're shooting for something closer to 30 on a house like this for the bedrooms to
▶ 2:09:15 not be pinched. But I'd say that they've done a good job with the roof line of masking its size. It's a small house on the site right now. A tiny house on the site right now. Yes. Like a 100-footer or something, right? It's like a little- Yeah. It's a little ranch, right? A single-story cape almost. It's not even- Oh, yeah. Anyway. Yeah, no. Okay. Board members, any question for the applicant right now? No, and I want to- I want to be... Sorry, go ahead. Go ahead, Liz. Go ahead. No, I was just cur... It's sort of piggybacking on top of someone else's comment a few minutes ago, but how does this new design, the proposed height and the massing compare to the neighbors? I guess I could pull up an aerial and take a look at that, but that was the only-
▶ 2:10:18 I can put that on the screen. It looks small in comparison to the other houses. Most of the houses at least look like they've got... This is a single story. The other, I don't even know, do you have a second floor that's habitable other than just a little shotgun space? There are two-story houses around it. There's quite a variety around it. Yeah, but then there are smaller houses as well. So it's a very... The house out back is definitely going to feel taller than this one, because that one almost like has the wall it faces in is only- And the two across the street are big houses, I think, in comparison. And then there's a smattering of 1,000 square foot single-story houses around it, because that's just what-
▶ 2:11:18 Right ... any room. Just a little bit of everything. I don't think it's going to feel... It's definitely going to feel like on the bigger end, but there's a house across the street, like number 11 there. That's big. Right. That's a big house. Yeah. I think it was- Even that one, with the way they did the roof line in the front still doesn't feel as big as street view as it does in aerial. Right. That looks like an addition to every house. I think it was a pretty modest house neighborhood that's slowly been converted and upgraded over the- I think you're absolutely right. Yeah, I think that's absolutely what it looks like. It's right around the corner from me. It'll probably be a pretty nice upgrade to the neighborhood.
▶ 2:12:10 Yeah, I think so. The reason why, I wasn't even planning to taking it down, but the house is very mold and it has a lot of asbestos. That's the reason why we were planning to take it down. There's no point to rebuilding it because there's so much mold in there. Mm-hmm. It's been vacant for so long, and I think it was, they had a flood pipe burst a few years back, and no one was living there. So that's the reason why I couldn't save the house. That's probably why it was better to demolish and put a brand new single family. It fits the street and the house around the area. Yeah. Okay. Yeah. I just put into the chat, I know you may recall Lori explained to us some of the zoning changes that were signed into law in July.
▶ 2:13:06 Part of that was an expansion of, I guess, or more liberalization under 48 Section 6, where if a single family was expanded and it met the setbacks, height, and stories, but was non-conforming as to lot size, that it would be allowed as of right. I think this fits squarely in there. Yeah. And I'm going to pull my second one tonight, where I don't think they need to be here. I think this is an as-of-right expansion, and it should have been approved by the building department. I just don't think we need to- It's a question. It isn't really an explanation because it's on your house, but- I think reconstruction falls under it. I think the spirit of it, Jeff, I agree. If there's a structure there and you're putting a new structure,
▶ 2:13:59 I couldn't agree with you more on that. I just think it's a... Yeah, I think when you look at 48A- I agree with how it works. I just don't think... I think it's as-of-right use, reconstruction. I think that at some point, we zoned our town to make all the lots illegal. It's the problem here. Yes. I think that's true. Adam, we opened the floor up for public comment. There was nobody that wanted to speak in favor or in opposition to this project. I don't see any hands raised. And let me check the email too. Oh, we do have an email. Okay. From Brian Stenson. He's just adding the note that the house on the lot has already been demoed. Okay. But there's no address. No address given. So I did the demo about a month ago. So we went under, like Jeff said, the
▶ 2:15:20 48A. And when we went to zoning, they wasn't required to do for us to get a special permit. But when I basically put everything together and get a demo permit, it was permitted, and we complete the demo. We brought the permit in with the plans, and the planning board came back to us and said that we need to pull a special permit. So that's the reason why I'm here tonight. I'm reading the language again, and I think they're right, Jeff. I missed the word or. Yeah. This isn't the or residential use it said too. Yeah. This is why the law was changed in July. Yeah. I just... I don't know. So Adam? Okay. So, it includes demo and rebuild? There's minor arguments floating around about that still. I think that's been bantered in the last several months.
▶ 2:16:29 I think when you read 48A in the aggregate, every other instance where the same language is used, it says reconstruction. It doesn't- Reconstruction. There's a small argument being made on that. I don't buy it. I think it applies. So, in the light that there's some argument, is the easiest course of action for us to... What would you suggest, Jeff? I'm curious. Yeah, I think given there's no opposition here tonight, there's an application before the board. We should just- I'm ready to vote yes. Yeah, we should just- We don't set precedent by voting yes on something here. Thank you. Yeah. Okay. I just think the building department should know. Yeah. Any last comments or questions by... Well, I should close the public hearing.
▶ 2:17:16 Are there any comments before we vote, board members? Hearing none. Four, in the matter of case 260306 Black Rock Road, the appeal of Bunnin Mary LLC for a special permit under Section 235-6.2 and 12.5 of the zoning ordinance to demolish the existing single family dwelling and construct a new single family dwelling on the non-conforming lot at 6 Black Rock Road in Melrose. All those in favor of granting the special permit by roll call vote. Jeff Eugeno? Yes. Liz Ryan? Yes. Raj Singh? Yes. Chris Coughlin? Yes. David Roach? Yes. Brian Thorpe is a yes. Dan Gelernter? Yes. I'm a yes. You have been granted the special permit. Thank you, board member. Thank you. Thank you so much. Have a good evening. Thank you. Have a good night.
▶ 2:18:22 Thank you. We do have a couple pieces of additional business. Is somebody here from 164 Essex Street? Salara. They are here. I don't know if they want to say anything or if they're just- So we went and looked at their- Observing, yeah. Yeah. Okay. So we went and reviewed the mock-ups at the site at 164 Essex Street. I wrote a letter. It's completely in keeping with the design intent of the project. The materials that were presented to us back when we approved the project are very, very close, if not identical, to what was on those documents. There have been a few places where they had to make some minor modifications, but none of which is like maybe moving a colored panel for some recesses and things
▶ 2:19:31 that they might not have shown us. Are you going to share some photographs? Yes, to me as well. Yeah. So the faux wood siding looks really good. It's pretty high quality in terms of its visual quality. The masonry is as we expected. The large-scale panels are concealed fastened, so there's no visible fasteners in any of the locations. It's a mix of hardy and cement board siding. Color palette is good, and based on what I saw, there's no reason to question what's being done there, I think. And I think our role is to review this is just that. We've approved it. We just want to see that it's in conformance with what we set forth as conditions of the construction. I didn't see anything that wasn't
▶ 2:20:46 in our review. Was there anything that you wanted to add, Adam, about that? No. Well said, Brian. You know, it's- It's just that it's part of the... It's one of the conditions of approval. We did need to do so. I just wanted to bring that up and that we have- I think we scrutinized this one tonight, but I think it came out really... It looks good. It's looking good as it continues to progress, so we're pretty happy with that. Is there anything we need to... Any action we need to take on that, Adam, other than just noting that we've reviewed it? My comment is that- I have your letter with your comments, and it was just in the condition that you review the mock-up and the materials. Yep. So it's just a condition tracking.
▶ 2:21:45 Then I think we've met that condition. Okay, next item. Approval of meeting minutes from October 14th. Any objection to unanimous consent? Is that the right way to say it? You proved it. Hearing none, the meeting notes from October 14th are approved as submitted. The next meeting date is December 9th. How does that look for people? I cannot make that meeting. Okay. Thank you. I hear... Oh, I think everybody else is okay. So our next meeting is December 9th. Yeah, it's after 58 too, so yay. Yay. Actually, I have Celtics tickets that night, but... Are you sure you're going to be with Raj? Huh? Do we have- I thought you said you were going to be with me. One, two, three, four, five. As long as David shows up, we're covered.
▶ 2:23:02 Yeah, when you say the 9th? December 9th, yes. Okay. Okay. Well, technically you can still go on without me. You're just going to need unanimity, so... Yeah, we don't want to do that. Sometimes it happens. I'll keep you guessing. Is there anything else that we needed to discuss tonight, Adam? No, that's it. That was it. Jeff and I are just going on about this 48 thing, and I think he's right. And you could argue that- I think so too. You could argue that would apply to the- Right. Reconstruction is a loaded term. There are people that- It's an alteration of an existing residential use. So if it's used as a residential structure now and you're going to alter that use- Yes. I would say reconstruction opens it up for new and renovation as
▶ 2:24:00 opposed to... But anyway, meeting's adjourned. The intent was that, like, let's not make the tiny zoning that we had in the '70s make it impossible to build things. Okay, that's the intent. Talk to Lori and- And the building commissioner. And Shannon. And Shannon too, yep. Yeah, she'll have an opinion. Exactly. Okay, thank you. Thank you all very much. Thank you. Good night. Good night. Happy Thanksgiving. Happy Thanksgiving. Made it before 10 o'clock. Yay. Keep going.